Hangzhou Baowei Auto Parts Completion Acceptance Monitoring Report
Environmental protection of stamping hot forming production line project completion
Acceptance Monitoring Report Form
Construction unit: Hangzhou Baowei Auto Parts Co., Ltd. Chongqing Branch
Prepared by: Chongqing Runlv Environmental Protection Engineering Co., Ltd.
July 2018
Legal Representative of the Construction Unit: Chen Maojian
Legal representative of the preparation unit: Chen Jiuyang
Project Leader: Chen Jiuyang
Filled by: Chen Jiuyang
Construction unit: Hangzhou Baowei Auto Parts Co., Ltd. Chongqing Branch
Telephone: 17783828386
Fax:
Zip Code: 400050
Address: No.2 Longjing Road, Liangjiang New District, Chongqing
Prepared by: Chongqing Runlv Environmental Protection Engineering Co., Ltd.
Telephone: 13883133085
Fax:
Zip Code: 400020
Address: 17-7, Building 1, No.68 Yanghe 1st Road, Jiangbei District, Chongqing
Table I
| Name of construction project |
Stamping hot forming production line project |
|||||||||||||||||||||||||||||||||||||
| Name of Construction Unit |
Hangzhou Baowei Auto Parts Co., Ltd. Chongqing Branch |
|||||||||||||||||||||||||||||||||||||
| Nature of construction project |
New construction □ Reconstruction and expansion □ Technical renovation □ Relocation |
|||||||||||||||||||||||||||||||||||||
| Construction site |
No.2 Longjing Road, Liangjiang New District, Chongqing |
|||||||||||||||||||||||||||||||||||||
| Main Product Name |
Body structural parts (B-pillar, A- pillar), chassis structural parts (middle channel, cross beam) |
|||||||||||||||||||||||||||||||||||||
| Design production capacity |
Body structural parts 700000/year, chassis structural parts 650000/year |
|||||||||||||||||||||||||||||||||||||
| actual production capacity |
Body structural parts 540000/year, chassis structural parts 495000/year |
|||||||||||||||||||||||||||||||||||||
| EIA time of construction project |
February 2017 |
Construction commencement time |
June 2017 |
|||||||||||||||||||||||||||||||||||
| Debugging time |
December 2017 |
Acceptance site monitoring time |
March 2018 |
|||||||||||||||||||||||||||||||||||
| EIA Report Form Approval Department |
Chongqing Municipal Environmental Protection Bureau Liangjiang New District Branch |
EIA Report Preparation Unit |
Chongqing Environmental Protection Engineering Design and Research Institute Co., Ltd. |
|||||||||||||||||||||||||||||||||||
| Environmental protection facilities design unit |
/ |
Environmental protection facilities construction unit |
/ |
|||||||||||||||||||||||||||||||||||
| Total Investment Estimate |
165 million |
Total Estimate of Environmental Protection Investment |
450000 |
Proportion |
0.27% |
|||||||||||||||||||||||||||||||||
| Actual total estimate |
153 million |
Environmental protection investment |
80000 |
Proportion |
0.05% |
|||||||||||||||||||||||||||||||||
| Acceptance monitoring basis |
1.1Preparation basis (1) Environmental Protection Law of the People's Republic of China (implemented in January 2015);
|
|||||||||||||||||||||||||||||||||||||
| Acceptance monitoring basis |
(2) Regulations of Chongqing Municipality on Environmental Protection (revised in 2017); |
|||||||||||||||||||||||||||||||||||||
| Acceptance monitoring basis |
(20) Measures for the Prevention and Control of Dust Pollution in Main Cities of Chongqing Municipality (Order No. 188 of Chongqing Municipal People's Government);
|
|||||||||||||||||||||||||||||||||||||
| Acceptance monitoring evaluation standard, label, grade and limit value |
1Executive standards for exhaust emissions
2Implementation standard for wastewater discharge
3Executive standard for noise emission
4Implementation standard for solid waste discharge
|
|||||||||||||||||||||||||||||||||||||
Table II
| Project construction content:
Figure2-1General Layout and Monitoring Point Layout of the Project Figure note: C is the noise monitoring point at the factory boundary; ○ indicates the exhaust gas monitoring point.
2Main production equipment
3Working system |
||||||||||||||||||||||||||||||||||||||||||||
| Consumption of raw and auxiliary materials and water balance:
Table2-3 Consumption List of Main Raw and Auxiliary Materials of the Project
Fig. 2-2 Water Balance of the Project
|
| Main process flow and pollution production link (with treatment process flow chart, marking pollution production node):
Fig. 2-3 Production Process and Pollution Production Node of the Project Brief description of process flow: |
Table 2-2 Composition and Change of the Project
Classification |
Project composition |
Construction contents of EIA and approval stage |
actual construction content |
Remarks |
| Main works |
Stamping forming line 2 |
2 sets of electric heating furnace, 2 sets of press and press control system and 2 sets of nitrogen making machine are configured to hot press the finished steel plate, with a production capacity of 300 punching times/h * line. |
1 stamping forming line, 2 electric heating furnaces, 1 press and press control system, and 1 nitrogen making machine |
The project is actually implemented in two phases, and only one phase has been completed at present. |
| Laser cutting process |
Set up 14 laser cutting machines for laser cutting of products. Capacity of 50/h * line |
Set up 7 laser cutting machines for laser cutting of products |
The remaining 7 laser cutting machines as the second phase of construction content |
|
| Shot blasting process |
One shot blasting machine is set for shot blasting and deburring production. Capacity is 2000/piece * line |
The shot blasting process was canceled, and the shot blasting process was outsourced to Chongqing Baoji Auto Parts Co., Ltd. |
The shot blasting process was canceled |
|
| Auxiliary works |
Laser cutting refrigeration system |
The equipment has its own cooling system, soft water circulation cooling, regular water replenishment, water replenishment outsourcing |
Equipment comes with cooling system, regular water replenishment, water replenishment outsourcing |
Consistent |
| Press cooling system |
The press is used for cooling. A cooling tower with a circulating water volume of 200 m3/h and one screw type cooling unit are set. The refrigerant is R134A. |
One cooling tower and one set of screw-type cooling unit are set, and the refrigerant is R134A. |
Consistent |
|
| Air compressor room |
One screw air compressor |
One screw air compressor |
Consistent |
|
| nitrogen making machine |
Nitrogen making equipment, 225 Nm3/h |
Nitrogen making equipment, 225 Nm3/h |
Consistent, the remaining 1 is included in the second phase of construction. |
|
| Water supply engineering |
The municipal water supply pipe on the municipal road on the west side of the land is connected to the water source. |
The municipal water supply pipe on the municipal road on the west side of the land is connected to the water source. |
Consistent |
|
| Auxiliary works |
Drainage works |
Rainwater is divided by rain and sewage, and rainwater is discharged through rainwater sewage in the plant area. |
Rainwater is divided by rain and sewage, and rainwater is discharged through rainwater sewage in the plant area. |
Consistent |
| Power supply works |
Municipal power supply |
Municipal power supply |
Consistent |
|
| Storage and transportation engineering |
Raw material storage area |
Steel plate raw material stacking, about 200m2 |
Steel plate raw material stacking, about 200m2 |
Consistent |
| Product library storage area |
Product storage, approx. 580m2 |
Product storage, approx. 580m2 |
Consistent |
|
| Methane storage area |
Methane gas cylinder temporary storage, storage capacity 50kg |
The production process eliminates methane as an auxiliary material. Therefore, the methane storage area was canceled |
Cancelled methane storage |
|
| Environmental protection engineering |
Cartridge type dust collector |
The laser cutting machine is equipped with a dust removal system, and the single design processing capacity is 4500 m3/h |
The laser cutting machine is equipped with a dust removal system, and the single design processing capacity is 4500 m3/h |
Consistent |
| Cartridge type dust collector |
Shot blasting waste gas treatment, design capacity 8000 m3/h |
The shot blasting process was canceled. Therefore, the shot blasting exhaust gas treatment system was eliminated |
Cancel the shot blasting waste gas treatment link |
|
| Temporary Hazardous Waste Yard (about 200 m2) |
Relying on the original hazardous waste yard of Baosteel |
Relying on the original hazardous waste yard of Baosteel |
Consistent |
|
| Waste water treatment station |
Hydrolytic acidification contact oxidation, relying on Baosteel's existing sewage treatment station to reach the "integrated sewage discharge standard" (GB8978-1996) after the first level standard discharge. |
Hydrolytic acidification contact oxidation, relying on Baosteel's existing sewage treatment station to reach the "integrated sewage discharge standard" (GB8978-1996) after the first level standard discharge. |
Consistent |
Table III
Main pollution sources, treatment and discharge of pollutants (attached with treatment flow diagram, indicating monitoring points of waste water, waste water and noise at the plant boundary):
1Exhaust gas
1.1waste gas pollution source
The atmospheric pollutants in this project mainly come from the dust generated during the laser cutting process, and the dust generation is about 2.0t/a.
1.2Waste gas pollution control measures
The dust generated in the laser cutting process of this project is discharged into the atmosphere in an unorganized form after being treated by the filter cartridge dust collector of the equipment.
1.3Waste gas treatment process

Figure2-4 Laser cutting waste gas treatment process flow chart


2Wastewater
2.1waste water pollution source
The wastewater pollution source of this project is mainly domestic wastewater generated by employees during the operation of the project, and the main pollutants are COD, SS and ammonia nitrogen.
2. 2Waste water pollution control measures
The domestic wastewater generated by this project relies on the existing sewage treatment facilities of Chongqing Baosteel Automobile Steel Parts Co., Ltd. and is discharged into Jialing River through the municipal sewage pipe network after reaching the first level standard in Table 4 of the Comprehensive Wastewater Discharge Standard (GB8978-1996).
2. 3Wastewater treatment process


Figure2-6 Process Flow Diagram of Domestic Wastewater Treatment of the Project


3Noise
3.1noise pollution source
The noise source of the project mainly comes from the press, laser cutting machine, air compressor, etc. The source intensity is about 75 ~ 95dB(A).
3. 2Noise pollution control measures
Low noise equipment shall be selected, and the noise generated shall be treated by basic buildings and building sound insulation.
3. 3Noise pollution control process


Fig. 2-8 Noise Control Process Flow
4Solid waste
4.1solid waste pollution source
(1) Domestic waste
The average amount of domestic waste generated by employees is 0.5kg per person. For 70 employees, the daily amount of domestic waste generated is 35kg/d, I .e. 10.5t/a.
(2) General industrial solid waste
Waste cotton yarn and gloves: the output of waste cotton yarn and gloves is about 0.6t/a.
Waste scrap: waste scrap mainly comes from hot pressing and laser cutting process of scrap, about 44t/a.
(3) Hazardous waste
The hazardous waste is mainly waste hydraulic oil, and the output is about 1.0t/a.
4. 2Solid waste pollution control measures
(1) Domestic waste
The domestic waste of this project is collected and transported and disposed of by the municipal sanitation department.
(2) General industrial solid waste
Waste cotton yarn and gloves: after collection, hand them over to the municipal sanitation department together with household garbage.
Waste leftover materials: after collection, they are sold to the waste recycling station.
(3) Hazardous waste
Hydraulic oil: after being collected and temporarily stored in the existing hazardous waste temporary storage yard of Chongqing Baosteel Automobile Steel Parts Co., Ltd., it will be disposed by Chongqing Alpha Petrochemical Co., Ltd.
4. 3Solid waste pollution control process
(1) Domestic waste


Figure2-9 Domestic waste treatment process flow chart
(2) General industrial solid waste


Figure2-10 General Industrial Solid Waste Treatment Process Flow Chart


Figure2-11 Waste scrap treatment process flow chart




Figure2-13 Waste hydraulic oil treatment process flow chart


Table IV
The main conclusions of the construction project environmental impact report form and the approval decision of the approval department:
1. EIA Review
In February 2017, Hangzhou Baowei Auto Parts Co., Ltd. Chongqing Branch commissioned Chongqing Environmental Protection Engineering Design and Research Institute Co., Ltd. to prepare and complete the "Stamping Hot Forming Production Line Project Environmental Impact Report Form". On July 31, 2017, Liangjiang New District Branch of Chongqing Environmental Protection Bureau approved the stamping thermoforming production line project of Chongqing Branch of Hangzhou Baowei Auto Parts Co., Ltd. with the approval letter of environmental impact assessment document of Chongqing construction project (Chongqing (Liangjiang) huanzhun [2017] No. 190), and issued corresponding requirements.
2. EIA Conclusion
(1) Overview of the proposed project
The proposed project leases two-span workshops of Chongqing Baosteel Phase IV with an area of about 7680 square meters for the construction of the proposed project. Two new hot stamping machines and automatic production lines were built, including 2 electric heating furnaces, 2 presses and press control systems, 1 hot-press forming cooling system, 2 nitrogen making machines, 14 laser cutting machines, and 1 shot blasting machine and its supporting dust collector. The total investment of the proposed project is 165 million yuan. After the completion of the project, the production and processing of B- pillar, A- pillar, middle channel, beam, etc. Production capacity 1.35 million pieces/year (1 million times/a).
(2) Rationality analysis of industrial policy and site selection
The construction of the project conforms to the requirements of the national industrial policy, conforms to the requirements of the "Industrial Structure Adjustment Guidance Catalog (2011) (Amendment)" (2013), conforms to the "Chongqing Industrial Project Environmental Access Regulations (Amendment)", and the land is in line with Chongqing Liangjiang New Area Land Master Plan. Under the premise of strictly implementing the pollution prevention and control measures proposed in the EIA report during the operation period of the project, from the perspective of environmental protection, the site selection is reasonable and the construction is feasible.
(3) Environmental quality status
To sum up, SO2, NOx and TSP in the area where the proposed project is located can meet the requirements of Class II standard of Ambient Air Quality Standard (GB3095-2012), and the atmospheric environmental quality in the area where the proposed project is located is relatively good on the surface. The water quality of Jialing River is in good condition, and all evaluation indexes can meet the requirements of Class III water standard of Environmental Quality Standard for Surface Water (GB3838-2002), 1# noise monitoring point meets the requirements of Class 4a standard of Environmental Quality Standard for Sound (GB3095-2008) in the daytime, but fails to meet the requirements of Class 4a standard of Environmental Quality Standard for Sound (GB3095-2008) at night, with the maximum exceeding value of 2.4dB. 2# noise monitoring point meets the requirements of Class 3 standard of Environmental Quality Standard for Sound (GB3095-2008), the main reason for the noise exceeding the standard at monitoring point 1# is that the surrounding land is in the development stage and there are many heavy vehicles in the past, resulting in the current situation of acoustic environment quality exceeding the standard. With the completion of the development of the surrounding land, the current situation of acoustic environment quality will be improved; the ecological environment quality of the proposed project is in good condition.
(4) Overview of main pollution prevention measures during operation period
① Exhaust gas
Dust generated by laser cutting during the operation period of the project is discharged unorganized after being treated by a dust collector. A small amount of exhaust gas can be rapidly diffused and diluted to a harmless state after being discharged into the air. The exhaust gas meets the monitoring concentration limit of 1.0 m3/mg in the standard unorganized discharge outlet of the main urban area in Chongqing Comprehensive Emission Standard for Air Pollutants (DB 50 418-2016), which has little impact on the surrounding environment.
The shot blasting waste gas (G2) of the proposed project is collected by the gas collecting hood, treated by the filter cartridge type dust collector, and discharged at high altitude through the 15m high exhaust cylinder. The shot blasting waste gas (G2) can meet the standard emission limit value of the main urban area in Chongqing Comprehensive Emission Standard of Air Pollutants (DB 50 418-2016)
② Noise
Ventilation machinery is proposed to adopt advanced low-noise equipment, and the equipment is subjected to vibration and noise reduction treatment, which has little impact on the external environment. The high-noise equipment in the production equipment shall be subjected to vibration and noise reduction to reduce the impact on the external environment; the high-noise equipment shall be rationalized to avoid the impact of continuous high noise. The staff next to the high-noise equipment should pay attention to adjusting the working hours and be equipped with earmuffs to avoid long-term exposure to high noise. The high-noise equipment adopts advanced low-noise equipment and reasonable layout. The warehouse is located on the south side near the residential area of Golden Garden, away from the office building, so as to reduce the impact on the environment. Strengthen the surrounding greening, improve the sound environment quality.
③ Solid waste
The solid waste generated during the operation period is mainly scrap steel and other corner waste and waste packaging bags generated during the hot pressing process. It is uniformly collected in the general solid waste storage yard on the west side of the land.
④ Ecological environment
The annual waste generated by the proposed project is about 210.96t/a, including 197.16t/a of general industrial solid waste, 3.3t/a of hazardous waste and 10.5t/a of domestic waste. The hazardous waste storage yard relies on the existing hazardous waste storage yard of Baosteel Group. The existing hazardous waste storage yard shall be reconstructed in accordance with the Pollution Control Standard for Hazardous Waste Storage (GB18597-2001). The temporary storage point of hazardous waste shall be provided with obvious special signs to prohibit mixing incompatible hazardous waste. The ground shall be treated for seepage control with leakage coefficient K≤ 10-10. At the same time, this assessment requires that the transfer of hazardous wastes of the proposed project shall be implemented in accordance with the relevant requirements of the State Environmental Protection Administration's Order No. 5 "Measures for the Management of Hazardous Wastes Transfers", so as to realize the management of hazardous wastes, ensure the reasonable disposal of wastes and clarify the final destination.
(5) Cleaner production
To sum up, this evaluation believes that the raw and auxiliary materials used in the project have certain adverse effects on the environment, and should be used in strict accordance with the measures proposed in this evaluation, which will reduce the impact on the environment; the cleanliness of the project's process technology equipment, products and fuel all meet the domestic cleaner production requirements, which will help promote the market competitiveness of the enterprise and promote the sound development of the enterprise.
This evaluation suggests that all staff should establish a strong awareness of environmental protection and clean production, and employees must be trained in this area before taking up their posts. Secondly, a series of strict and feasible clean production and management procedures should be formulated within the enterprise, and full-time or part-time management personnel should be set up to implement each environment of clean production layer by layer.
(6) Total amount control
The discharge of pollutants during the operation period of the proposed project shall be strictly in accordance with the "Guiding Opinions of the General Office of the State Council on Further Promoting the Paid Use and Trading of Emission Rights" (Guowanfa [2014] No. 38), "Regarding the issuance of Chongqing Municipality to further promote the emission rights (Sewage, waste gas, garbage) paid use and trading work (Trial) (Draft for Solicitation of Comments)" The corresponding requirements require legal trading and obtain corresponding emission rights.
The regulatory indicators for pollutant discharge are: solid waste: general solid waste: 210.96t/a, hazardous waste: 3.3t/a, and domestic waste: 10.5t/a. Total wastewater discharge: COD0.18t/a, ammonia nitrogen 0.03t/a.
(7) Comprehensive conclusion
The construction of the project conforms to the requirements of the national industrial policy, conforms to the requirements of the "Industrial Structure Adjustment Guidance Oyster (2011) (Amendment)" (2013), conforms to the "Chongqing Industrial Project Environmental Access Regulations (Amendment)", and the land is in line with Chongqing The overall planning of land use in Liangjiang New District. During the operation period of the project, under the premise of strictly implementing the pollution prevention and control measures proposed in the EIA report, from the perspective of environmental protection, its site selection and reasonable construction are feasible.
Approval decision of 3. approval department
On July 31, 2017, Liangjiang New District Branch of Chongqing Environmental Protection Bureau approved the stamping thermoforming production line project of Chongqing Branch of Hangzhou Baowei Auto Parts Co., Ltd. with the approval letter of Chongqing construction project environmental impact assessment document (Yu (Liangjiang) Huanzhun [2017] No. 190), and the reply is as follows:
The application form for approval of the environmental impact assessment document of the stamping hot forming production line project submitted by your unit, the environmental impact assessment report form of the project and related materials have been received. After study, the approval is as follows:
According to the relevant provisions of the the People's Republic of China Environmental Impact Assessment Law and other laws and regulations, as well as the opinions of the expert group of the technical review meeting on the environmental impact report of the project, the 1. agrees in principle to the environmental impact report of the project prepared by Chongqing Environmental Protection Engineering Design and Research Institute Co., Ltd. The environmental protection measures, conclusions and suggestions proposed in the form.
Main construction content and scale of the 2. project: renting the 4# workshop of Chongqing Baosteel Automobile Steel Parts Co., Ltd., No. 2 Longjing Road, Liangjiang New District, Chongqing, to produce the body boundary and chassis structure of the automobile. The project mainly builds two hot stamping presses and automated production lines, as well as auxiliary work such as cooling systems, public storage and transportation projects and environmental protection projects. After the completion of the project, it is expected to produce 700000 pieces of body structure and 650000 pieces of chassis structure. The total investment of the project is 165 million yuan and the environmental protection investment is 450000 yuan.
3. The project shall be implemented in strict accordance with the emission standards and total amount control indicators approved in this Approval (see Annex). Any of the following four acts or circumstances shall be reported to our bureau in advance or in a timely manner:
(I) increase or change the location of the sewage outlet, resulting in the prevention and control of pollutant discharge or the direction of pollutant discharge is not in conformity with the specified EIA;
(II) increase or change the raw and auxiliary materials, unified production, resulting in the increase of new pollution factors;
(III) increasing the production capacity of products (including intermediate products), resulting in an increase in waste water, waste gas and solid waste, making environmental protection facilities incompatible;
Environmental pollution or disturbance to residents after the (IV) project is put into operation.
4. In the process of construction and operation of the project, the pollution prevention and control measures proposed in the environmental impact report shall be conscientiously implemented, and the design and construction plan of environmental protection facilities shall be further implemented before the construction starts, with the following work as the key points.
(I) do a good job in wastewater pollution control
The domestic sewage and ground cleaning wastewater of the Project are treated by the domestic sewage treatment station of Chongqing Baosteel Automobile Steel Parts Co., Ltd.
(II) strengthen waste gas treatment measures
Laser cutting dust is discharged in an unorganized form after being treated by the filter cartridge dust collector provided by the equipment to reach the standard. Shot blasting waste gas is collected by a gas collecting hood and treated by a filter cartridge dust collector to reach the emission limit of Chongqing's "Comprehensive Emission Standard for Air Pollutants" (DB50/418-2016) in the main urban area, and then discharged to the standard through a 15m exhaust cylinder.
(III) to strengthen the prevention and control of noise pollution
Select low-noise equipment, reasonably arrange the positions of fans, air compressors, sheet metal equipment and other high-noise equipment, and take measures such as sound insulation and vibration reduction to ensure that the noise on the side of the project facing Jinkai Avenue and Cuiyun Interchange meets the Class 4a standard of the Environmental Quality Standard (GB3096-2008), and the other areas meet the Class 3 standard of the Environmental Quality Standard (GB3096-2008).
(IV) increase solid waste recycling and standardize solid waste disposal
During the operation period, waste hydraulic oil, oily wastewater, waste activated carbon and other hazardous wastes shall be temporarily stored in accordance with the regulations and requirements of the Hazardous Waste Storage Pollution Control Standard. The hazardous waste transfer form system shall be strictly implemented and handed over to the unit with corresponding hazardous waste transfer and disposal qualification for treatment. The leftover materials, waste packaging materials and shot blasting residue shall be sent to the waste purchasing station for recycling. Waste cotton yarn and domestic garbage shall be uniformly disposed by the municipal sanitation department.
5. In the process of construction and operation of the project, environmental management shall be strengthened and relevant environmental protection procedures shall be performed in accordance with the law.
(I) establish and improve environmental protection management institutions and systems, and strengthen environmental management and monitoring during the operation period.
The (II) strictly implements the "three simultaneous" system of environmental protection in which environmental protection facilities and the main project are designed, constructed and put into use at the same time. Before the project is completed and put into operation, it shall apply to our bureau for a sewage discharge permit.
In the (III) of major changes in the nature, scale, location, process, and pollution prevention and control measures of the project, the EIA document should be re-submitted to our bureau for approval.
Table V
Acceptance Monitoring Quality Assurance and Quality Control:
1. monitoring analysis method
See Table 5-1 for the acceptance monitoring and analysis methods of the Project.
Table5-1 List of Monitoring and Analysis Methods of the Project
monitoring factor |
monitoring analysis method |
Method/Basis |
Remarks |
| TSP |
Ambient air-Determination of total suspended particulate matter-Gravimetric method |
GB/T15432-1995 |
/ |
| Environmental noise at boundary of industrial enterprises |
Emission standard for environmental noise at boundary of industrial enterprises |
GB12348-2008 |
/ |
2. monitoring instrument
See Table 5-2 for acceptance monitoring instruments of the Project.
Table5-2 List of Monitoring Instruments of the Project
monitoring factor |
Name and model of monitoring instrument |
Instrument No. |
Remarks |
| TSP |
Electronic balance E204-IC |
E204-IC 000075 |
All instruments are certified or within the validity period of calibration |
| Intelligent Integrated Sampling ADS-2062E |
000381、000382 |
||
| Integrated Flow Calibration ZR-5410A |
000283 |
||
| Environmental noise at boundary of industrial enterprises |
Multi-function sound level meter AWA6228 |
000240 |
|
| Multi-function sound level meter AWA6228 |
000443 |
||
| Acoustic Calibrator AWA6221A |
000446 |
Qualification of 3. personnel
The personnel of this acceptance monitoring and acceptance monitoring unit are all certified. The collection, storage, transportation and handover of samples are managed and recorded by special personnel. The on-site adoption and testing are carried out in strict accordance with the acceptance monitoring plan, and various conditions during the monitoring period are recorded in detail. The whole process quality control is implemented in accordance with the requirements of the Environmental Monitoring Quality Assurance Management Regulations. The monitoring instruments used shall be verified by the measurement department and within the validity period, the monitoring data shall be strictly subject to the three-level audit system.
Quality assurance and quality control in the process of 4. water quality monitoring and analysis
The wastewater is not monitored in this acceptance. Therefore, this acceptance does not involve quality assurance and quality control in the process of water quality monitoring.
Quality assurance and quality control in 5. gas monitoring and analysis
The acceptance technology requires the acceptance monitoring unit to strictly follow the Technical Specification for Monitoring of Fixed Pollution Sources HJ/T397-2007, and the distribution and sampling shall be in accordance with the Monitoring and Analysis Methods for Air and Waste Gas (4th Edition).
Quality assurance and quality control in the process of 6. noise monitoring and analysis
The acceptance of noise monitoring in strict accordance with the relevant provisions of the national standards and methods for monitoring. During the monitoring, the production condition is normal, the weather is clear and windless, which meets the monitoring requirements. The sound level meter was calibrated before and after the test, and the sensitivity difference before and after the measurement was 0dB.
Quality Assurance and Quality Control in the Process of 7. Solid Waste Monitoring and Analysis
This acceptance does not involve solid waste monitoring. Therefore, there is no corresponding quality assurance and quality control measures.
Table VI
- Contents of acceptance monitoring:
- Waste water
-
- The domestic wastewater generated by this project is treated by the sewage treatment facilities set up by Chongqing Baosteel Automobile Steel Parts Co., Ltd. and discharged into Jialing River through the municipal sewage pipe network after reaching the first level standard in Table 4 of the Comprehensive Wastewater Discharge Standard (GB8978-1996). The sewage treatment facilities of Chongqing Baosteel Automobile Steel Parts Co., Ltd. supported by this project have passed the completion environmental protection acceptance in December 2017, and the sewage treatment facility acceptance monitoring when the project has been in the normal production stage, according to the sewage treatment facility acceptance monitoring results show that the sewage treatment facility pollutant monitoring indicators can meet the "integrated sewage discharge standard" (GB8978-1996) Table 4 in the first standard. Therefore, this acceptance will no longer monitor the pollutants discharged from the sewage treatment facilities set up by Chongqing Baosteel Automobile Steel Parts Co., Ltd.
-
- Exhaust gas
- The source of waste gas during the operation of this project is mainly the dust generated during the laser cutting process. The dust generated during the laser cutting process of this project is discharged into the atmospheric environment in an unorganized form after being treated by the filter cartridge type dust collector of the equipment. See Table 6-1 for the location, frequency, factor and monitoring period of the waste gas monitoring point of this project.
-
-
- Table6-1 List of Waste Gas Monitoring of the Project
-
-
- The source of waste gas during the operation of this project is mainly the dust generated during the laser cutting process. The dust generated during the laser cutting process of this project is discharged into the atmospheric environment in an unorganized form after being treated by the filter cartridge type dust collector of the equipment. See Table 6-1 for the location, frequency, factor and monitoring period of the waste gas monitoring point of this project.
|
|
|
|
|
|
|
|
|
|
- Noise
-
- The noise source of the Project is mainly mechanical equipment. See Table 6-2 for the location, frequency, factor and monitoring period of noise monitoring in the Project.
-
- Table6-2 List of Noise Monitoring of the Project
-
- The noise source of the Project is mainly mechanical equipment. See Table 6-2 for the location, frequency, factor and monitoring period of noise monitoring in the Project.
-
|
|
|
|
|
|
|
|
|
|
- solid waste
-
- The solid waste sources of this project are mainly domestic waste, general industrial solid waste (waste scrap) and hazardous waste. The generated domestic waste shall be collected and handed over to the municipal sanitation department of the park. The generated general industrial solid waste (waste scrap) is collected and sold to the waste recycling station. The generated hazardous waste (waste hydraulic oil) is collected and regularly handed over to Chongqing Alpha Petrochemical Co., Ltd. for disposal by taking "three prevention measures. This acceptance does not monitor solid waste.
-
Table VII
| Records of production conditions during acceptance monitoring: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Acceptance monitoring results:
③ Noise Table7-2 List of Noise Emission Monitoring and Compliance of the Project
④ Solid waste |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Table VIII
Acceptance monitoring conclusion:
Commissioning effect of 1. environmental protection facilities
According to the completion acceptance monitoring of waste water and waste gas of the project for two consecutive days from March 05 to 06, 2018, the production load during the monitoring period is 76.1, and all environmental protection and control facilities operate normally during the monitoring period, meeting the acceptance monitoring conditions and requirements; According to the monitoring results, the monitoring results of unorganized dust emission and factory boundary noise of the project can meet the requirements of corresponding standards, indicating that the pollution prevention and control measures taken by the project are effective and feasible.
Total quantity control indicators are not involved in the operation of the project.
Impact of 2. engineering construction on the environment
The impact of the construction of the Project on the environment is mainly due to the adverse effects of waste gas and waste water on the surrounding environment. According to the monitoring results, the waste gas generated by the project can be discharged up to the standard, and the domestic wastewater generated by the project is pre-treated by the pre-treatment facilities set in the project and used as the surrounding farmland as agricultural fertilizer, and is not discharged to the outside. According to the investigation and understanding, there has been no relevant environmental complaints since the completion of the project. Therefore, the impact of the project on the environment is small, and the impact is within the acceptable range.
3. comprehensive conclusion
The "Stamping Thermoforming Production Line Project" of Hangzhou Baowei Auto Parts Co., Ltd. Chongqing Branch has set up full-time environmental protection management personnel. The engineering environmental protection approval procedures and environmental protection data files are complete, and an environmental protection management system has been established. Various environmental protection facilities and environmental management measures are basically implemented in accordance with the requirements of the EIA report and its approval, and the pollutant monitoring results meet the requirements of corresponding standards, during the construction of the project, methane was canceled as an auxiliary material and the production process was canceled, and the construction site, process and scale were not significantly changed compared with the EIA and approval.
To sum up, the project meets the requirements of environmental protection acceptance.
Latest News
2020-03-11
Tang Liangzhi: turn crisis into opportunity, continue to increase investment in research and development, speed up the transformation and upgrading of enterprises
On the morning of March 6, 2020, Tang Liangzhi, deputy secretary of the Chongqing Municipal CPC Committee and mayor, and his party visited Chongqing Pingwei Automobile Technology Co., Ltd. (hereinafter referred to as Pingwei shares). Accompanied by Li Shuzhou, General Manager of Chongqing Pingwei Technology (Group) Co. Duan Chenggang, member of the Standing Committee of the Chongqing Municipal Party Committee and Secretary of the Party Working Committee and Director of the Management Committee of Chongqing Liangjiang New Area, was also among the leaders participating in the investigation.
2020-03-11
Ten years of "model" sword today "with" edge
At 16:00 on January 18, 2020, Chongqing Pingwei Automobile Technology Co., Ltd. held a grand celebration of the 10th anniversary of the "ten-year" model "sword at the Happy Valley Caesar Palace.
2020-01-14
Pingwei shares successfully passed the (26) batch of national enterprise technology center accreditation
On January 9, 2020, after two years of unremitting efforts, Chongqing Pingwei Automobile Technology Co., Ltd. (hereinafter referred to as "Pingwei Co., Ltd.") successfully passed the 2019 (26th batch) National Enterprise Technology Center organized by the Innovation and High-tech Development Department of the National Development and Reform Commission, and was officially recognized as the "National Enterprise Technology Center" after being verified by customs and taxation ".
2020-03-11
Chongqing Pingwei Automobile Technology Co., Ltd. successfully completed Chongqing postdoctoral research station
Early July 2019. According to the relevant requirements of the Municipal Human Resources and Social Security Bureau Office "Notice on Carrying out the Application Work of Municipal Postdoctoral Research Workstations in 2019" (Yurenshe Office [2019] No. 87), after the qualification review, expert review, and director's office review of the Municipal Postdoctoral Management Office, Chongqing Pingwei Automobile Technology Co., Ltd. successfully completed the municipal postdoctoral research workstation.
2018-11-12
Pingwei Stock Successfully Held 2018 Mazda Global Stamping Technology Exchange
At 9: 00 a.m. on October 18, 2018, the 2018 Mazda Global Stamping Technology Exchange was successfully held in the Technology Center of Pingwei Co., Ltd. The Japanese participants attending the meeting included Andamoto Minister of Mazda Production Technology Department, Hashimoto Minister of Tooling Production Department, Miyagi Heavy Manager of Car Body Technology Department and Kawasaki Vice President of Mazda-Toyota US Manufacturing Plant.
2018-10-30
Chongqing Pingwei Automobile Technology Co., Ltd. Cleaner Production Audit Publicity
According to the "the People's Republic of China Cleaner Production Promotion Law", "the People's Republic of China Circular Economy Promotion Law", "Cleaner Production Review Measures" (National Development and Reform Commission, Ministry of Environmental Protection Decree No. 38) and "Cleaner Production Review, Evaluation and Acceptance Guidelines" (Huan Ban Science and Technology [2018] No. 5) and other regulations, in accordance with the notice of Chongqing Environmental Protection Bureau Liangjiang New District Branch on carrying out the second batch of mandatory cleaner production audits in 2018 and other requirements, our company organized and carried out cleaner production audit work within the scope of the company this year. Now we will publicize the basic situation of the company's production and pollution discharge to accept public supervision.